The procedures usually adopted for well development are as follows: 1. Over-pumping 2. Backwashing 3. Mechanical surging 4. Air surging and pumping 5. High-velocity jetting 6. High-velocity water jetting combined with simultaneous pumping. Procedure # 1. Over-Pumping: In the over pumping method, the well is pumped at a discharge rate higher than the discharge rate […]